Site Preparation

On-site Evaluation | Site Preparation | Production | On-site Installation | Post Install Procedure

A string line is used to identify and mark the location of your American Recreational Tram system. Our objective is to preserve and protect as much of the natural surrounding area as possible. 

The string line will be the guide for final installation of the track.  The track will follow the exact angle and path of the string line, so placement of this line is critical.

Measuring installation site length
Installation line after excavation

With the installation line identified, the site must be cleared 4 feet either side of the string line for a total path width of 8 feet. 

It is the responsibility of the customer to clear the installation site of vegetation and to prepare the site for construction.

 