On-site Installation
On-site Evaluation
| Site Preparation | Production
| On-site Installation | Post Install Procedure
Track Installation

Our professional installation crew
begins laying out and securing the track for your American
Recreational Tram System. The track
supports are 10 feet long and are placed approximately 5-8 feet
into the ground, depending on soil & rock conditions. Following
the installation of each section of track, the sections are
thoroughly cross-braced to strengthen and ensure stability of
the track.
|
 |
-ofDSC00028.jpg) |
Installation of Drive System
The Drive System frame is attached to the top end of the track
assembly.
Once the frame has been installed, the
electric motor, electronic brake, heavy-duty gear box, pillow
blocks, over speed braking system and main cabling sheaves are
installed and inspected. |
 |
 |
Installation of Electrical System
The installation of the electrical system is completed. This
includes the installation and calibration of limit switches and control buttons. |
Installation of Cabling Systems
The installation of the main cable system, over limit cable
system and the over speed cable system is completed from the top
to the bottom of your Tram System. |
 |
 |
Installation of Electrical Panel
The final phase of your American Recreational Tram System installation
is the addition of the electrical panel. All power service connections are
made and inspected for complete functionality. |